Process-Heating Magazine
  Home
  Subscribe
  Process Cooling
  Subscription Customer Service
  Online
  Industry Headlines
  Web Exclusives
  Buyers Guide
  Career Search
  Webinars
  Energy Notes
  Heating Highlights
  Drying Files
   Safety Zone
  Current Issue
  Features
  Columns
  Products
  Calendar
  Resources
  Archives
  Equipment Overview
  Digital Editions
  Classifieds
  eNewsletter
  eNews Archives
  Market Research
  PH Info
Search in: EditorialProductsCompanies
Coat Tubes, Extend Boiler Life

February 1, 2010

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare

Enlarge this picture
Boiler superheater tubes sprayed and torch-fused with Colmonoy 88 can extend the life of the tubes.
Boiler superheater tubes sprayed and torch-fused with Colmonoy 88 can extend the life of the tubes.


More than three years ago, a large waste-to-energy plant initiated a large-scale test of a spray-and-fuse alloy from Wall Colmonoy Corp., Madison Heights, Mich. The plant had a job shop overlay 86 boiler tubes with Colmonoy 88, coating the 25' long, 2.5" dia. tubes with the protective material.

Since the alloy was applied, tube-metal temperatures approached 900°F (482°C), and the boiler has run 24 hours a day, seven days a week. The tubes are vital components of the energy plant’s superheater, which is a part of one of the boilers. The coating has helped extend the tubes’ life from a one-year cycle to three, tripling their lifespan. Colmonoy 88 extends boiler tube life, especially in the secondary superheater section of a boiler where the most severe environment exists for mass burn and refuse-derived fuel boilers.

The Colmonoy coating offers four advantages for superheater tubes and panels, according to Wall Colmonoy.
  • Longer life than tube shields, stainless tubes or any type of Inconel overlay, including Inconel 625, 622, 52 and 72.
  • Improved high temperature erosion properties compared with other alloys tested.
  • Reduction of molten salt or slag buildup on the tubes.
  • Better heat transfer properties than shielding or overlays.
  • Reduced maintenance costs from labor and material savings.
Satisfied with the results, the waste-to-energy plant now plans to test Colmonoy 88 in two of its other facilities, according to Wall Colmonoy.


Links

|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.



















BNP Media
© 2010 BNP Media. All rights reserved. | Privacy Policy