A $12 million contract to refurbish a recovery boiler for a U.S. manufacturing facility was awarded to Babcock & Wilcox. B&W’s scope includes the design and manufacture of a steam drum, furnace, superheater, generating bank, air system, economizer and other components. Delivery is scheduled for the second half of 2020.

B&W has an installed base of more than 350 recovery boilers that generate power and process steam.