Steam heating technology commonly used to provide process heating will provide comfort heating for a large medical facility in the Southern California desert. The facility purchased 13 boilers from Parker Boiler to handle the steam and heating load of a new expansion.

Three hot water boilers handle the heating/reheat load for the two buildings, and 10 model 9.5Ls handle the humidification and sterilization needs. Both systems include the company’s Parker View Lead-Lag (PVLL) controllers. With these systems controlling the boilers, the minimum necessary boilers required to handle the load are enabled. In addition, key points are monitored remotely by the building management system (BMS).